LHC Commissioning Working Group - LHCCWG
Topics
Topics treated in 2006
Topic |
Presenter |
# |
|||
450GeV |
|||||
SPS extraction, transfer, injection, first turn |
Lamont (sector test) |
||||
Circulating beam and RF capture |
Arduini, Butterworth |
||||
450GeV initial commissioning |
|
||||
|
Beam Instrumentation |
Jones |
|||
|
BPM |
||||
BLM |
|||||
BCT |
|||||
Q, coupling, Q’ |
|||||
Emittance |
|||||
Abort gap monitor |
|||||
|
Beam dump |
Goddard |
|||
|
Pilot measurement program |
Zimmermann |
|||
450GeV increase beam intensity |
|
||||
|
Collimation |
Assmann |
|||
|
Machine protection |
Uythoven |
|||
|
RF issues |
Butterworth |
|||
|
Feedbacks |
Steinhagen |
|||
450GeV optics |
|
||||
|
Beta beating, coupling, dispersion |
Tomas Garcia |
|||
|
Response matrix measurements |
Wenninger |
|||
|
Non-linear checks |
Zimmermann |
|||
|
Separation dipoles transfer function |
Zimmermann |
|||
|
Aperture in the arcs |
Redaelli |
|||
|
IR bumps and aperture through IR |
Papaphilippou |
|||
2 beam operation |
pending |
|
|||
|
|
|
|
|
|
Collisions 450GeV |
|
|
|||
|
Monitoring |
Bravin |
|||
|
Bringing beams into collision |
Burkhardt |
Above 450GeV |
|||||
Snapback single beam |
Lamont |
||||
|
Beam instrumentation |
pending |
|
||
|
Machine protection |
pending |
|
||
|
|
|
|
|
|
Ramp single beam |
Lamont |
||||
|
Beam instrumentation |
pending |
|
||
|
Machine protection |
pending |
|
||
|
Beam dump |
pending |
|
||
|
|
|
|
|
|
Single beam at top energy |
|
|
|||
|
Beam instrumentation |
pending |
|
||
|
Pilot measurement program |
pending |
|
||
|
Top energy optics |
pending |
|
||
2 beams at top energy |
pending |
|
|||
|
Measurement program |
|
|
||
|
|
|
|
|
|
Collisions top energy unsqueezed |
pending Burkhardt?? |
|
|||
|
|
|
|
|
|
Squeeze |
|
|
|||
|
Optics |
Giovannozzi |
|||
|
Collimators |
Assmann |
|||
|
Operations |
Lamont |
|||
Collisions top energy squeezed |
pending Burkhardt?? |
|
|||
|
|
|
Others |
||
Data storage during the TI8 tests |
Lamont |
|
Workshop on TAN integration |
Burkhardt |
|
Pros and Cons of 75ns operation |
Arduini, Zimmermann |
|
LHCf and TOTEM |
Burkhardt |
|
Circumference difference between rings |
Arduini |
|
Collisions at 450GeV, a first look |
All |
|
Background in the LHC experiments |
Talanov |
|
Fill to fill reproducibility |
Bottura |
|
As built database, brainstorming |
All |
|
Inject and dump |
Goddard |
|
Tracking between sectors |
Bordry, Wenninger |
17 |
|
|
|