LHC Commissioning Working Group - LHCCWG

 

Open Actions for Recycling

Topic

Action

Date

Status

Integrity of machine settings (save snapshot of settings/back up)

Coordinators

14.02.2007

 

Define cycle and recovery procedures for all types of LHC magnets

FiDeL Team

28.02.2007

 

Feedback of beam-based corrections to Fidel/WISE

L. Bottura, E. Todesco, F. Schmidt

08.05.2007

 

Prediction of the momentum reproducibility from fill to fill (radial movements, interplay between chromaticity measurements & momentum cleaning)

R. Assmann, L. Bottura, M. Giovannozzi

17.05.2006

in progress

Include hysteresis model in FiDeL field predictions

L. Bottura, M. Strzelczyk et al?

28.02.2007

 

Review and finalize precycles when extended measurement results are available

R. Wolf et al

11.09.2007

 

Precycles for Q5/Q6 and for b5 spool pieces

R. Wolf et al

11.09.2007

 

Volunteers for extended measurement campaign

All

11.09.2007

 

Follow-up on software infrastructure for extended magnet measurements

J.-P. Koutchouk

25.09.2007

 

 

 

 

 

Open Actions for Aperture Meeting

Topic

Action

Date

Status

 

 

 

 

Specifications for as-built database. Recruitment of help.

P. Collier and O. Bruning?

06.09.2006

in progress

Set up aperture database

S. Redaelli

26.07.2006

in progress

Follow-up on aperture scans at each fill

S. Redaelli, R. Steinhagen

23.10.2007

 

Appoint aperture czar

R. Bailey, M. Giovannozzi, R. Assmann? LTC?

20.11.2007

 

Report on aperture issues to LTC

R. Bailey

20.11.2007

 

 

 

 

 

Open Actions for Filling-Schemes Meeting

Topic

Action

Date

Status

Follow up on early filling schemes

M. Ferro-Luzzi,

W. Herr

04.12.2007

 

Sequential filling or alternating filling of the two rings

V. Kain, S. Fartoukh et al

08.05.2007

 

Identify most robust filling scheme for first years of operation

P. Collier + All?

14.02.2007

 

Open Actions for Parameters+Tolerances Meeting

Topic

Action

Date

Status

 

 

 

 

Establish prioritized list of measurements and beam parameters for 2007 and for 2008

R. Bailey + All?

31.01.2007

 

Define or agree on specific target parameters for each commissioning stage

R. Bailey + All?

31.01.2007

 

 

 

 

 

Open Actions for (BI) Readiness Meeting

Topic

Action

Date

Status

Provide BI commissioning plans and include them in web procedures

J.-J. Gras, V. Kain, M. Gruwe et al

14.02.2007

 

Set up milestones for instrument commissioning

M. Lamont, R. Bailey, J.-J. Gras + All? 

31.01.2007

 

Establish, prioritize and check procedures, application software and documentation for each measurement

M. Lamont, R. Bailey, J.-J. Gras + All? 

31.01.2007

 

Schedule LHCCWG discussion or dedicated meeting on LSA interface for each instrument

R. Bailey, J.-J. Gras

31.01.2007

 

Follow-up on temperature variation of BPM readings

R. Jones, R. Steinhagen

23.10.2007

 

Effect of satellite bunches on BPM readings and related tolerances

R. Jones, G. Arduini

23.10.2007

 

 

 

 

 

Other Open Actions

Topic

Action

Date

Status

 

Injection

Present updated estimate of emittance growth from kicker ripple issue to the LTC

B. Goddard

04.12.2007

already foreseen for early 2008

Machine-detector interface:

Can VELO be closed with LHCb experimental field at full strength?

Y. Papaphilippou , M. Ferro-Luzzi

20.09.2006

 

Simulation of 450-GeV background conditions

V. Talanov

06.09.2006

 

Absolute calibration of BCTs

R. Jones?

06.09.2006

 

Produce a realistic estimate of the vacuum conditions expected for the 450 GeV run.

AT/VAC

06.09.2006

 

Follow up pp simulations at 7 TeV and 450 GeV with Nikolai Mokhov and/or Mika Huthinen.

E. Bravin or H. Burkhardt

06.09.2006

 

Sensitivity of luminosity signal (e.g., to orbit angle & pressure)

H. Burkhardt, R. Assmann, J.-P. Koutchouk?

22.03.2006

 

Loss distribution of collision debris

=> LCWG

22.03.2006

referred to LCWG

Roman pot operation during commissioning (email D. Macina)

not yet assigned

05.04.2006, 12.04.2006

 

Further discuss data exchange with experiments

T. Wijnands, H. Burkhardt

27.03.2007

 

Follow-up on background signals

H. Burkhardt, M. Ferro-Luzzi

22.05.2007

 

Circulate convention memo to experiments

P. Baudrenghien, M. Ferro-Luzzi

22.05.2007

 

 

 

 

 

Collisions:

Check resolution of beam-beam coupling?

J.-P. Koutchouk or volunteer

06.09.2006

not urgent

Hysteresis of orbit correctors used in separation scans at 450 GeV?

W. Venturini Delsolaro

06.09.2006

to be discussed

Collision detection with IR beam loss monitors

R. Schmidt or B. Dehning?

06.09.2006

to be discussed

Specify conditions for useful signals from luminosity monitors

H. Burkhardt

19.06.2007

 

Follow up ad-hoc signal from experiments for collision optimization

A. MacPherson, R. Alemany, M. Lamont, J.-J. Gras

19.06.2007

 

 

 

 

 

Energy matching and energy stability

Energy tracking between sectors

R. Bailey, F. Bordry, J. Wenninger

22.03.2006

presentation by Freddy Bordry in fall 2006

 

 

 

 

Beam lifetime

Develop response to poor beam lifetime

J.-P. Koutchouk?

31.01.2007

to be discussed

 

Orbit feedback:

Feedback behavior during squeeze

R. Steinhagen. J. Wenninger, M. Giovannozzi

29.11.2006

considered

 

 

 

 

Machine protection:

Check time constants and margins of warm compensator magnets

Y. Papaphilippou

20.09.2006

to be discussed

Machine protection during aperture measurements for web procedure

R. Schmidt

26.07.2006

to be discussed

Numerous open questions on MPS commissioning

?

03.05.2006

?

Possibility of single-beam dump

B. Goddard et al

01.11.2006

to be further discussed

Follow up MP issues of ac dipole and aperture kicker

J. Uythoven

10.04.2007

treated in MPSWG

Clarify strategy for setting of collimators and protection devices during commissioning and determine the associated relaxed tolerances

J. Uythoven, Goddard, R. Assmann, M. Giovannozzi, J. Wenninger, V. Kain, et al

 

treated in MPSWG

 

 

 

 

 

 

 

 

Diagnostics

Follow up re-cabling of IR BPMs for bringing the beams into collision

R. Jones

31.01.2007

to be discussed

AC Dipole for aperture measurements

S. Fartoukh?

26.07.2006

to be discussed

Clarify actual BPM performance

R. Jones

14.06.2006

in progress

Agree on kicker amplitudes which are safe and/or useful

J. Uythoven?, F. Schmidt?, S. Fartoukh

27.03.2007

to be discussed

Follow-up of two-beam IR button BPMs at the LTC

O. Bruning

27.03.2007

to be discussed

Study interference of ac dipole with orbit feedback and collimation

O. Bruning

10.04.2007

to be discussed

Define the necessary BLM beam tests

H. Burkhardt, L. Ponce

24.04.2007

to be discussed

Interface of RadMon to other systems

T. Wijnands, R. Schmidt

24.04.2007

to be discussed

Follow up of K modulation

M. Lamont, R. Tomas

08.05.2007

 

Follow up timing signals at injection

P. Baudrenghien

08.05.2007

 

BPM sum signal mode ready for start up? Average orbit available in threading mode? Intensity limit on BGI from quenches? Check residual effect of BGI magnetic field with experts. Performance specifications for BCTDC. Check if BCTF resolution is sufficient to do the lifetime calculation for collimation in real time. Hardware signal triggering beam dump below Q4 quench limit? Tickler for tune and chromaticity measurements in nominal operation?

J.-J. Gras

19.06.2007

 

Detailed list of what needs to be done for the commissioning of each instrument. Justification of dedicated beam time in view of tight schedule; specify number of MDs and details of commissioning steps.

J.-J. Gras

19.06.2007

 

Send specification of beam-lifetime signal for collimation to Jean-Jacques Gras

R. Assmann

19.06.2007

 

Prepare beam tests with new enlarged BPMWI

J.-J. Gras, J. Uythoven

19.06.2007

 

Clarify status of wall-current monitor

J.-J. Gras, RF Group

19.06.2007

 

 

 

 

 

Timing:

Discussion on pre-pulse (need & requirements)

B. Goddard

05.04.2006 , 01.11.2006

in progress, still questions

Follow up identification of wrong bucket injection

H. Burkhardt

27.03.2007

to be discussed

Definition of bunch 1

P. Baudrenghien

08.05.2007

 

 

 

 

 

Optics:

Transfer data from magnet evaluation activity to machine operation database

J.-P. Koutchouk, M. Lamont or M. Giovannozzi

20.09.2006

to be discussed

Beam-based measurement & correction of transfer function for separation dipoles using orbit feedback, in particular if D2 is known

?

12.07.&26.07.2006

to be discussed

Study expected effect of triplet-quad roll error and related measurement procedures

?

12.07.2006

to be discussed

Clarify whether the non-reproducibility is the same or different for the two apertures

?

14.06.2006

to be discussed

Clarify dispersion correction

R. Tomas

14.06.2006

in progress

Global view of expected imperfections (beta beating etc.)

J.-P. Koutchouk, M. Giovannozzi

03.05.2006

in progress; partly or fully  addressed by R. Tomas in LHCCWG#8

Simulation of beam signals & tune resolution

F. Zimmermann

22.03.2006

initial simulation done with HEADTAIL in LHCCWG#3

Injection septa reproducibility

J. Wenninger?

15.11.2006

partly done LHCCWG#17

Effect of tracking errors in warm magnets

R. Assmann

15.11.2006

in progress

Add the measured cold bore profile and cross-check the misalignment part in the WISE LHC model

WISE Team

28.02.2007

to be discussed

Finalize procedure for beta function measurements at 7 TeV

R. Tomas, J.-P. Koutchouk,  F. Zimmermann

27.03.2007

to be discussed

Standardized interface for measurements and on-line model simulations

F. Schmidt

08.05.2007

 

Communicate AT/MEB results on magnet geometries and voluntary misalignments to BI

L. Bottura

19.06.2007

 

Refined estimates of static and dynamic beta beating with all contributions

LCU, Collimation Team

11.09.2007

 

 

 

 

 

Collimation:

Reproduce Fig.12 of Ralph’s Chamonix XII report showing inefficiency vs. closed-orbit change for 8% beta-beat at the worst phase

S. Redaelli, R. Assmann?

31.01.2007

referred to LCWG

Loss maps for 450 GeV commissioning & calibration run

S. Redaelli, R. Assmann?

26.07., 06.09.2006

referred to LCWG

Estimate collimation inefficiency and loss rate in commissioning

S. Redaelli?

26.07.2006

referred to LCWG

Initial setting & set up during squeeze

R. Assmann, ?

LTC 52

initial setting LHCCWG#5, squeeze set up in presentation fall 2006

Check n1 for squeezed optics

R. Assmann, T. Weiler

29.11.2006

referred to LCWG

 

 

 

 

Accelerator Systems

Follow-up open questions on vacuum system

F. Zimmermann

10.04.2007

Planned

Discussion on LHCCWG interaction with CPP and MPP

R. Bailey?

22.05.2007

 

Report on vacuum commissioning plan

AT-VAC

23.10.2007

 

 

 

 

 

Ramp and squeeze:

Provide recent squeeze data to operation and prepare for including them into future power test

?

31.05.2006

to be discussed with Mike

Decide where to handle decay effects: Fidel or LSA?

?

31.05.2006

to be discussed with Mike

Prepare to later use all data available from AT (per magnet)

?

31.05.2006

to be discussed with Mike

Specify in detail incorporation of trims before ramping. Ensure and test compatibility with feedbacks and make sure that machine safety cannot be compromised

?

31.05.2006

to be discussed with Mike

Make sure that there will be no problem with the 0.01 A check, for example for correctors with low currents

?

31.05.2006

to be discussed with Mike

Specify the number of stops required for the set-up of the beam dump, before we can ramp to 7 TeV

?

31.05.2006

to be discussed with Mike

Present detailed procedure for steps in commissioning the energy ramp

?

31.05.2006

to be discussed with Mike

Clarify number of pickups available for the radial loop during commissioning

?

31.05.2006

to be discussed with Mike

Allocate tolerance budgets for static and dynamic errors

?

31.05.2006

to be discussed with Mike

Provide collimator settings during the ramp

?

31.05.2006

to be discussed with Mike

Clarify the strategy for incorporation of trims before the ramp and evaluate consequences

?

31.05.2006

to be discussed with Mike

Test real-time channel for trims before commissioning

?

31.05.2006

to be discussed with Mike

Include magnet current limits and check current ramp rates

M. Lamont

29.11.2006

in progress

Finalize squeeze/un-squeeze optics for IR2 and IR8

M. Giovannozzi

29.11.2006

referred to LOC

Study of combined ramp and squeeze in regard to magnet properties

W. Venturini-D., J.-P. Koutchouk, M. Giovannozzi

29.11.2006

in progress

Follow up sextupole behavior during the squeeze, and the problem of low settings for MQT and MQTL. Take additional data as needed to fully characterize the MQM and MQY decay characteristics

W. Venturini-Delsolaro et al

28.02.2007

to be discussed

Decide between the options of single-beam and two-beam squeeze commissioning, and choose an IP squeeze sequence. Clarify whether in commissioning phase A.8 the machine protection is fully operational at the start and at the end of the ramp

S. Redaelli, EICs, and V. Kain?

28.02.2007

to be discussed

Survey attempts of, and experience with, beta* tuning at other colliders

J.-P. Koutchouk

23.10.2007

 

 

 

 

 

Documentation/Web Follow Up:

Example procedure

EICs & V. Kain

03.05.2006

in progress

Send comments on procedures to Magali, Verena and friends

All

14.02.2007

to be discussed

 

 

 

 

General:

 

 

 

Follow up of LTC open actions

All

11.09.2007

 

 

 

 

 

Completed Actions

 

 

 

Discussion on commissioning optics model

M. Giovannozzi

05.04.2006

Completed, private communication M. Giovannozzi 04.12.2006

Confirm ramping time of experimental magnets and possibility of slow down

M. Ferro-Luzzi

20.09.2006

LHCCWG#13

LHCf statement (machine-detector interface)

H. Burkhardt

05.04.2006

LHCCWG#4

75-ns spacing - report to LTC (commissioning beam parameters)

R. Bailey

05.04.2006

LHCCWG#2, LHCCWG#6, LTC#56

Difference in ring circumference; need for decoupled rf systems?

G. Arduini, J.-P. Koutchouk

22.03.2006, 05.04.2006

LHCCWG#8

Review of orbit feedback functioning & calibration (orbot feedback)

R. Steinhagen, J. Wenninger

05.04.2006

LHCCWG#6, LHCCWG#9

Scenario for bringing beams into collision

H. Burkhardt

19.04.2006

LHCCWG#12

Effect of SSS tracking errors on chromaticity

S. Fartoukh

15.11.2006

LHCCWG#17

Possible non-closure of nc/sc separation dipoles during ramp

S. Fartoukh

15.11.2006

LHCCWG#17