Entry condition |
E.A.7.1 |
Machine protection for 450 GeV |
E.A.7.2 |
2 beams operation (phase A.6) |
E.A.7.3 |
Good Vacuum for low
background |
E.A.7.4 |
Collimators
at injection settings |
E.A.7.5 |
Power
circuits |
.01 |
Correctors should be
available and calibrated; bumps should be commissioned |
.02 |
Octupoles OFF |
E.A.7.6 |
High level controls |
.01 |
Separation scan application
debugged and available |
.02 |
Online FiDeL magnetic model available via LSA for the correctors
participating in the bumps |
.03 |
Online display of the beam
parameters: current, lifetime, tune, chromaticity, orbit, etc. |
.04 |
Online display of BLMs |
.05 |
Off-line preparation of bumps or,
alternatively, possibility to do dynamic bump calculation |
E.A.7.7 |
BI |
.01 |
BPM commissioned and good calibration |
.02 |
BLMs commissioned and calibrated |
.03 |
BCT commissioned and calibrated |
.04 |
Wire scanners commissioned |
.05 |
Extrapolation of BPM readings to IP
available |
.06 |
Signals from scintillators installed in IP1
and IP5 |
E.A.7.8 |
Beam parameters under control |
.01 |
Good beam lifetime
(about 1 hour) |
.02 |
Orbit |
.03 |
Tune (injection
tune) and tune coupling |
.04 |
Chromaticity |
E.A.7.9 |
Communication with experiments |
.01 |
DIP operational
[2] |
.02 |
Regular scheduled meetings |
.03 |
TV-screen status page (pages 1) |
E.A.7.10 |
Beams
should be synchronized
[note 1] |