References for Phase A.4:[1] F. Zimmermann, Commissionging procedures for Phase A.4, LTC meeting 2007-05 (April 11th, 2007). [2] F. Zimmermann, Initial Measurement Program, 3rd LHCCWG meeting (April 5th, 2006). [3] F. Zimmermann, Proposed Beam Measurement Program in 2007, 19th LHCCWG meeting (January 31st, 2007). [4] R. Tomas, 450 GeV optics: beta beating, coupling, dispersion, 8th LHCCWG meeting (June 14, 2006). [5] R. Tomas et al, Procedures and accuracy estimates for beta-beat correction in the LHC, EPAC’06. [6] S. Redaelli, Mechanical Aperture and Momentum Aperture measurements, 11th LHCCWG meeting (July 26th, 2006). [7] Y. Papaphilippou, 450 GeV Optics: IR Aperture and IR Bumps, 13th LHCCWG meeting (September 20th, 2006). [8] R. Steinhagen, Overview of Feedbacks and Implications for Commissioning, 6th LHCCWG meeting (May 17, 2006). [9] J. Wenninger, Response Matrix Measurements and Analysis, 9th LHCCWG meeting (June 28, 2006). [10] J. Wenninger, Tracking error measurement and correction, 17th LHCCWG meeting (November 15th, 2006). [11] R. Assmann, 450 GeV commissioning: collimators, 5th LHCCWG meeting (May 3rd, 2006). [12] F. Zimmermann, Summary of Parameter Tolerances, 19th LHCCWG meeting (January 31st, 2007). [13] F. Zimmermann, Nonlinear Field Quality Checks, 10th LHCCWG meeting (July 12th, 2006). [14] F. Zimmermann, Transfer function for separation dipoles, 10th LHCCWG meeting (July 12th, 2006). [15] S. Fartoukh, JP. Koutchouk, Measurement of the Betatron Tunes and of the Chromaticity and Amplitude Detunings in the LHC Rings, EDMS document LHC-B-ES-000X.00.rev0.2 (2007). |
|