LHC Commissioning Working Group - LHCCWG
Topics
Topic |
Responsible |
Date@LHCCWG |
Injection and First turn |
Sector test team |
08.03.06 |
Circulating beam, RF capture |
GA, AB |
22.03.06 |
450 GeV: initial commissioning |
JW, FZ |
05.04.06 ? |
450 GeV: detailed measurements |
FZ, MG, SF |
|
450 GeV: 2 beams |
RA, JU |
|
Nominal cycle |
|
|
Snapback – single beam |
|
|
Ramp – single beam |
|
|
Single beam at physics energy |
|
|
Two beams to physics energy |
|
|
Physics |
|
|
Commission squeeze IR 1 and IR 5 |
|
|
Physics partially squeezed |
|
|
|
|
|
75ns operation |
GA, FZ |
22.03.06 |
TI2; commissioning plans |
|
|
First turn; tracking between sectors |
|
|
Collisions at 450 GeV |
|
|
Luminosity monitoring (with LHCf) |
|
|
|
|
|
RADMON; commissioning plans |
|
|
RAMSES; commissioning plans |
|
|
Vacuum; commissioning plans |
|
|
FiDeL; commissioning plans |
|
|
BLM; commissioning plans |
|
|
Cryo; commissioning plans |
|
|
Magnetic reproducibility (covered by FiDeL?) |
|
|
Squeeze IR 2 |
|
|
Squeeze IR 8 |
|
|
Effects of LHCb dipole polarity switch |
|
|
Effects of ALICE dipole polarity switch |
|
|
|
|
|
|
|
|
topics arisen from meeting discussions
topic | reference LHCCWG |
loss distribution of collision debris | 22.03.2006 |
sensitivity of luminosity signal, e.g., to IP orbit angle or pressure. | 22.03.2006 |
simulation of beam signals and tune resolution in LHC | 22.03.2006 |
rephasing between rf systems of the two rings | 22.03.2006 |
energy tracking between sectors | 22.03.2006 |