Topics treated in 2006

Topic

Presenter

#

450GeV

SPS extraction, transfer, injection, first turn

Lamont (sector test)

1

Circulating beam and RF capture

Arduini, Butterworth

2

450GeV initial commissioning

 

 

Beam Instrumentation

Jones

3

 

BPM

BLM

BCT

Q, coupling, Q’

Emittance

Abort gap monitor

 

Beam dump

Goddard

3

 

Pilot measurement program

Zimmermann

3

450GeV increase beam intensity

 

 

Collimation

Assmann

5

 

Machine protection

Uythoven

5

 

RF issues

Butterworth

6

 

Feedbacks

Steinhagen

6

450GeV optics

 

 

Beta beating, coupling, dispersion

Tomas Garcia

8

 

Response matrix measurements

Wenninger

9

 

Non-linear checks

Zimmermann

10

 

Separation dipoles transfer function

Zimmermann

10

 

Aperture in the arcs

Redaelli

11

 

IR bumps and aperture through IR

Papaphilippou

13

2 beam operation

pending

 

 

 

 

 

 

 

Collisions 450GeV

 

 

 

Monitoring

Bravin

12

 

Bringing beams into collision

Burkhardt

12

Above 450GeV

Snapback single beam

Lamont

7

 

Beam instrumentation

pending

 

 

Machine protection

pending

 

 

 

 

 

 

 

Ramp single beam

Lamont

7

 

Beam instrumentation

pending

 

 

Machine protection

pending

 

 

Beam dump

pending

 

 

 

 

 

 

 

Single beam at top energy

 

 

 

Beam instrumentation

pending

 

 

Pilot measurement program

pending

 

 

Top energy optics

pending

 

2 beams at top energy

pending

 

 

Measurement program

 

 

 

 

 

 

 

 

Collisions top energy unsqueezed

pending Burkhardt??

 

 

 

 

 

 

 

Squeeze

 

 

 

Optics

Giovannozzi

18

 

Collimators

Assmann

18

 

Operations

Lamont

18

Collisions top energy squeezed

pending Burkhardt??

 

 

 

 

Others

Data storage during the TI8 tests

Lamont

2

Workshop on TAN integration

Burkhardt

2

Pros and Cons of 75ns operation

Arduini, Zimmermann

2

LHCf and TOTEM

Burkhardt

4

Circumference difference between rings

Arduini

8

Collisions at 450GeV, a first look

All

9

Background in the LHC experiments

Talanov

11

Fill to fill reproducibility

Bottura

14

As built database, brainstorming

All

15

Inject and dump

Goddard

16

Tracking between sectors

Bordry, Wenninger

17

 

 

 

topics legacy link