Home

Phase A.1

First turn:  injection commissioning; threading, commissioning beam instrumentation. Ring 1, ring 2.

Phase A.2

Circulating pilot:  establish circulating beam, closed orbit, tunes, RF capture, ...

Phase A.3

450 GeV initial commissioning:  system commissioning: instrumentation, beam dump,...
Phase A.4 450 GeV optics: beta beating, dispersion, coupling, non-linear field quality, aperture,...
Phase A.5 450 GeV, increasing intensity: prepare the LHC for unsafe beam
Phase A.6 450 GeV, two beam operation
Phase A.7 450 GeV, collisions
Phase A.8 Snap-back and ramp: single beam/two beams
Phase A.9 Top energy checks
Phase A.10 Top energy, collisions
Phase A.11 Squeeze: Commission the betatron squeeze in all IP's
Phase A.12 Beam commissioning with experimental magnets