Objective
Priority
O.A.8.1
Reasonable transmission of pilot through snap-back (first minute of the ramp).
1
O.A.8.2
Single pilot at 7 TeV - ramp transmission good enough to get pilot intensity up.
O.A.8.3
Beam dumps commissioned up to 7 TeV.
O.A.8.4
Machine protection commissioned for these intensities to 7 TeV.