All RF diagnostics and
loops commissioned at 450 GeV pilot intensity to 3x1010
p+
|
|
|
BPM/orbit corrector system
fully commissioned
|
|
|
Orbit
flattened in injection and dumping region
|
|
|
Other beam instrumentation commissioned
|
|
|
BCT systems
fully commissioned
|
|
|
Tune/chromaticity measurement systems fully commissioned
|
|
|
Wire
scanners fully commissioned
|
|
.04 |
Undulator
commissioned at 450 GeV |
1 |
.05 |
BSRA
commissioned |
1 |
|
Synchrotron
light monitor commissioned
|
|
|
Rest gas ionisation monitor commissioned
|
|
|
BLMs
parasitic commissioning if occasion (beam induced quench)
|
|
|
BLM
commissioning with quench on purpose
|
|
|
Orbit/tune/coupling feedback tested
|
|
|
Orbit/tune/coupling feedback for injection optics
fully commissioned
|
|
|
|
|
|
Basic optics
checks with multi-turn data
|
|
|
First emittance
measurements with wire scanners
|
|
|
Longitudinal
losses determined
|
|
|
Longitudinal
profile and bunch length measured vs. time
|
|
|
Liftetime optimised to > 1
h
|
1 |
|
Cycling machine established
|
1 |
|
|
|
|
Rough
setting-up of TDI, TDI in
|
|
|
Full commissioning of beam
dumping system with pilot and 3 x 1010 p+ for 450
GeV
|
|
|
MKD
synchronisation verified with beam
|
|
.02 |
Extraction
region and dump line aperture measured |
1 |
.03 |
Beam position at
TDE verified/adjusted |
1 |
.04 |
All BI
acquisition for XPOC verified with beam |
1 |
.05 |
TCDQ and
TCS roughly set up |
1 |
|
IPOC and
XPOC references adjusted
|
|