[1]
G.Arduini,
Circulating pilot and RF capture,
LTC on March 14th, 2007.
[2]
G.Arduini, A.Butterworth,
Circulating Beam and RF Capture LHCCWG#2, 2006.
[3]
G.Arduini,
Circumference Difference between the 2 LHC Rings LHCCWG#8, 2006.
[4]
R.Jones,
Beam Instrumentation - BPM, BLM, BCT, Transverse Diagnostics LHCCWG#3, 2006.
[5]
J.Wenninger,
Response
Matrix Measurements and Analysis LHCCWG#9, 2006.
[6]
J.Wenninger,
Tracking Error Measurement and Correction LHCCWG#18, 2006.
[7]
F.Zimmermann,
Summary of
Parameter Tolerances LHCCWG#19, 2007.
[8]
F.Zimmermann,
What
to do if we cannot get in tolerance LHCCWG#19, 2007.
[9] O.Bruning,
The minimum machine and the first 1000 turns or so
Chamonix XII, 2003
[10] S.Fartoukh,
M.Hayes,
Commissioning
tunes to bootstrap the LHC LCC#31 on
October 23rd, 2002.
[11] A.Verdier,
First Turn, LHC Project Note 308.
[12]
P.Baudrenghien,
RF
Commissioning with Beam LHCCWG#27,
2007.
[13] R.Wolf,
Magnet Setup Cycling for LHC LHCCWG#30,
2007.
[14] E.
Shaposhnikova,
Longitudinal beam parameters during acceleration in the LHC, LHC Project
Note 242.