References for Phase A.2:

[1]  G.Arduini, Circulating pilot and RF capture, LTC on March 14th, 2007.

[2]  G.Arduini, A.Butterworth, Circulating Beam and RF Capture LHCCWG#2, 2006.

[3]  G.Arduini, Circumference Difference between the 2 LHC Rings LHCCWG#8, 2006.

[4]  R.Jones, Beam Instrumentation - BPM, BLM, BCT, Transverse Diagnostics   LHCCWG#3, 2006.

[5]  J.Wenninger, Response Matrix Measurements and Analysis LHCCWG#9, 2006.

[6]  J.Wenninger, Tracking Error Measurement and Correction LHCCWG#18, 2006.

[7]  F.Zimmermann, Summary of Parameter Tolerances LHCCWG#19, 2007.

[8] F.Zimmermann, What to do if we cannot get in tolerance LHCCWG#19, 2007.

[9] O.Bruning, The minimum machine and the first 1000 turns or so Chamonix XII, 2003

[10] S.Fartoukh, M.Hayes, Commissioning tunes to bootstrap the LHC LCC#31 on October 23rd, 2002.

[11] A.Verdier, First Turn, LHC Project Note 308.

[12] P.Baudrenghien, RF Commissioning with Beam LHCCWG#27, 2007.

[13] R.Wolf, Magnet Setup Cycling for LHC LHCCWG#30, 2007.

[14] E. Shaposhnikova, Longitudinal beam parameters during acceleration in the LHC, LHC Project Note 242.