Possible Problems in Phase A.10:

  1. Poor intensity lifetime:

    • Check/optimize working point

  2. Emittance growth:

    • Check nothing kicks the beam;

    • Vibration (low frequency FFT);

    • Minimize RF noise

  3. Background always raising:

    • Check orbit, aperture, vacuum

  4. Poor luminosity:

    • Re-optimize-check/adjust separation